top of page
reboisement-min.webp

"Palm'Orchids" nursery

Arboriculture in arid zones

Installation of a diversified full soil nursery

Permaculture design

Rehabilitation of an eroded zone into a diversified field arboricultural production zone on the level line

Implementation of the project

My mission: Creation of the design, implementation and realization of the project with the formation of a team.

  • No-till soil preparation

 

  • Implementation of green manures

  • Topography, area modeling

  • Establishment of culture corridors

  • Installation of irrigation

  • Choice of varieties, planting planning

  • Follow-up and support

Screenshot 2022-11-03 at 10-51-00 Simple Professional Inventory Sheet.png

General Information

- Project area: 1 Ha
- Drip irrigation - Water "borehole"

- Duration of implantation: 3 months

- Planting: 4500 plants

The project in pictures

       by theme ...  

SOIL REGENERATION BEFORE TREE PLANTING

Green manure cycle

  • Regenerate the soil before planting in arboriculture

  • Light soil preparation

  • Sowing of a "barley / bean" mixture

DESIGN

Planning your project

  • Make the topography of the place

  • Place culture beds

  • The realization is done in stages according to the means implemented and the seasons of installation.

  • The design is carried out on the basis of plans, budgets, implementation stages and schedules.

TREE PLANTING

Planting

  • Assemble a team, have the equipment, prepare the desired planting model, manage the pace of workers, manage safety

IRRIGATION

Adapt irrigation as needed

  • Adapt the network to its needs

  • Drip irrigation

PLANTING MONITORING

The accompaniment

  • Train teams, monitor the start of irrigation and adapt it according to the terrain and climate

  • Prepare maintenance, green manure, cutting and harvest schedules ...

Do you want to carry out this type of project?

Training is available:

"Palm'Orchids" nursery

Arboriculture in arid zones

bottom of page